In this market the association is often a harder gate than the building department, and it is the one people leave until last. It should be first.

Approval before permitDesign guidelines govern
Row of stucco houses with tile roofs in a Southwestern subdivisionHouses in a planned subdivision
01Order of operations

Approval first, permit second

A building department will happily permit a structure your association then refuses. The permit does not override the CC&Rs, and the association is not bound by the permit.

Association review is also usually the slower of the two, and often runs on a committee that meets monthly. That meeting date, not the plan check queue, is what sets your start date.

Covered patio with lounge seating beneath a solid roofSolid roof over lounge seating
02What to have ready

The submission that gets approved first time

  • Site plan. Where the structure sits on the lot, with setbacks to every boundary.
  • Elevations. Height above grade, and how it reads against the house from the street.
  • Materials and colour. Every visible surface, named. Matched to the house is the usual expectation.
  • Roof profile. Pitch and form consistent with the existing roof.
  • The guidelines themselves. Read them before designing, not after being refused.

This page is general guidance about how association review usually works. It is not legal advice, and your own recorded CC&Rs and design guidelines govern. If a refusal matters enough to challenge, that is a question for an Arizona attorney.

03Where it bites hardest

Design review beyond the HOA

Two communities on this site add a layer above the ordinary association. Sedona runs its own municipal design review, and for an outdoor structure that is usually a bigger constraint than the building code. The Village of Oak Creek has been a certified Dark Sky Community since 2016, which reaches any lighting built into a cover.

Clarkdale is a purpose-built 1912 company town with a coherent historic character, and Jerome is a former mining town of 464 people on a hillside. In both, what the neighbours and the town expect a structure to look like is a real part of the conversation.

House built among red rock formationsHouse built among red rocks

The other gate

Once the association has approved the design, the building department decides whether it can be built. Those thresholds differ sharply across the county.

04Questions

HOA approval

Can an HOA refuse a patio cover?

An association can generally apply its architectural guidelines to an outdoor structure, and refusal or conditions are within the normal scope of that. What it cannot do is act outside its own recorded documents or the procedures Arizona law sets for it. Read the CC&Rs and the design guidelines before you design anything, because they usually constrain the shape more than the building code does.

Which comes first, the HOA or the permit?

Architectural approval first, in almost every case. A building department will permit a structure the association later rejects, and you will have paid for both. Association review also tends to be the slower of the two, so it sets your timeline.

What does an association usually want to see?

A site plan showing setbacks and where the structure sits on the lot, elevations with height above grade, the material and colour of every visible surface, and the roof profile. Colour matched to the house and a roof pitch consistent with it are the two things most often asked for.

Does Arizona law protect anything specifically?

Arizona has enacted homeowner protections on particular items over the years, solar being the best known. Those statutes are specific and they do not amount to a general right to build an outdoor structure. Treat the association's architectural guidelines as governing unless a specific statute says otherwise, and take legal advice if a refusal matters enough to challenge.

Is this common in Prescott?

Common enough to plan around. Several of the communities on this site are planned developments with active architectural review, and Cordes Lakes recorded a median age of 54.6 with 31.5 percent of residents aged 65 or over at the 2020 census, which is the kind of profile that comes with organised associations.